Tongda Island Case Study
Solution Categories
Featured Solution

Tongda Island Case Study


2024-10-13

9Tongda Island Case Study

 

The project has a treatment capacity of 2,800 m3/day with a COD of 10,000 mg/L and involves wastewater from a chemical enterprise. Longantai Enviro. applied its independently developed multistage catalytic oxidation technology to remove hard-to-degrade pollutants while enhancing biodegradability, thereby reducing the burden on subsequent biochemical treatment processes. The treated effluent meets the receiving standards of the industrial park’s wastewater treatment plant with COD < 100 mg/L, ammonia nitrogen < 15 mg/L, and total nitrogen < 45 mg/L. This facilitates the recycling of production water within the chemical park, addressing water resource shortages and aligning with China’s sustainable recycling strategy.

 

Wastewater Quality: The wastewater has a high concentration of organic matter and poor biodegradability, making it particularly challenging to treat.

Influent Water Volume: 2800 m3/d

Process Description: The main components include structures such as an equalization tank, emergency tank, pH adjustment tank, high-efficiency sedimentation tank, A/O biochemical tank, secondary sedimentation tank, and sludge thickening tank. Equipment includes the LEM micro-electrolysis reactor, LDF Fenton reactor, and UASB (Upflow Anaerobic Sludge Blanket) reactor. Additional facilities consist of a backwash blower room, sewage treatment plant effluent discharge pipeline, emergency wastewater pipeline, reclaimed water pipeline, sludge treatment workshop, dosing room, deodorization room, laboratory, and a comprehensive building.