Inquiry
Form loading...
The sewage treatment plant project in Panjin Liaoning
Solution Categories
Featured Solution

The sewage treatment plant project in Panjin Liaoning


2024-10-13

The sewage treatment plant project in Panjin Liaoning

 

The domestic sewage treatment plant in Zhucheng has a treatment capacity of 15,000 m3/day and is responsible for handling all domestic wastewater within its jurisdiction. After preliminary treatment and extended biochemical processing, a significant portion of biodegradable and readily biodegradable organic pollutants are degraded. However, due to fluctuations in water quality, the effluent occasionally exceeds the standards. Longantai Enviro. applies its independently developed ozone catalytic oxidation technology to efficiently remove residual refractory pollutants, ensuring that the final effluent meets the required standards.

 

Wastewater Quality: The wastewater quality fluctuates significantly, making treatment challenging.

Influent Water Volume: 15000m3/day

Process Description: The main components include a bar screen, regulation tank, A2O biological treatment tank, sedimentation tank, ozone catalytic oxidation tank, sodium hypochlorite contact disinfection tank, dosing room, blower room, ozone preparation workshop, sludge dewatering room, sludge drying workshop, and odor treatment unit.